I need some welding done:
both driver and passenger side foot steps I can see the ground from, lifting the plastic up it's all fooked underneath
2 holes at the bottom of the bodywork, one at the bottom of the pillar, left of the fuel filler. And one near the rear jacking point on the passenger side. Both about 2 square inches.
Any idea what I'm looking at in cost, and what preps I need to make before taking it for welding?
many thanks
