
so the plan is;-
1/ To have it finished by July 2013 for the Silverstone F1 as ive bought the tickets !!, if its not the wife will do evil horrible things to me

2/ get the underside sand blasted and sprayed with epoxy mastic, and get the the underside rebuilt so i can move it around on wheels instead of dollys !!

3/ get all body work repaired, preped and sprayed in epoxy 421.
4/ refit loom and refurb the AAZ engine ready to fit.
The above i want to try and get done by April

Any way thats the plan, heres some pics !!!










dont get under vehicles to weld any more fed up getting burnt !!


