Big day for engine install. Sunday 6th Jan 2013.
Mark Foss volunteered to assist again.
Stared by removing engine from stand onto deck.
Fitted crankshaft oil seal, flywheel, clutch and cover plate.
Fitted starter motor in position and reconnected wiring.

Engine ready to slide under van.
Slid engine under van on old timber flooring and carpet.
Once under van lifted engine onto two trolley jacks and manoeurved into position. Set engine at correct height with Mark keeping it balanced level. Then just pushed straight onto the shaft and bell housing. How EASY was that. Mark did not believe me when I said its gone straight in. Fitted bolts and nuts to bell housing.
Installed tinware over exhaust silencer and jacked engine upto correct height and fitted bolts though cross member to chassis. Reightened gearbox mounting. ENGINE IN.

Overhead shot of engine.
Started fitting misc. pipework, electrical connections, alternator, oil filler neck etc.
Mark came in his van which gave us some reference for fitting of electrical connections and routing of wires in engine bay.
Had to now stop at this point as it was getting dark and still a lot of misc. items to fit before we can fire up. Will now leave until next weekend to finish off.
Outstanding works.
Install water bottles.
Fit water pipes.
Fit oil sensor wire.
Renew petrol pipes.
Fit clutch slave cylinder and bleed.
Fill with oil.
Fill with antifreeze.
Fire up.
Check with strobe light.
Many thanks to Mark for his help.