So we stripped it down , took the roof off, stripped the paint, did a bit of welding, preped it, sprayed it with 2K with laquer over and then put it back together

CLICK ON THE PICTURE FOR A SLIDESHOW
Total of 5 weeks work, and not as expensive as some think