So far so good.
Posted: 23 Jul 2013, 22:30
So I currently get as much time as I can spare on my Doka. This equates to about 1 day a month...
Today however I removed my plastic heater pipes and started on stainless replacements, cleaned my engine bay, tried to remove the rear castle nuts ( snapped my breaker bar, soaking in Pepsi right now) and removed my fuel tank. All of these jobs were filthy and a bitch in this heat but I love it. I stink of diesel, my fingernails are so black my wife won't come near me and I've really worn in my overalls.
I'm due to fit an EJ25 that I've removed and have these parts for but I have a few questions...
Has anyone done 1.6td to EJ25?
Any jobs I should do now the tank is out ( i gave new straps and sender, and of course it's going to be petrol so will be flushed out. )
Does anyone know the length of positive cable I need to go from the battery ( relocated to behind rhd drivers side rear light) to the starter ( rjes needs to know this for loom build)
Every day the end is in sight...
Thanks.
Today however I removed my plastic heater pipes and started on stainless replacements, cleaned my engine bay, tried to remove the rear castle nuts ( snapped my breaker bar, soaking in Pepsi right now) and removed my fuel tank. All of these jobs were filthy and a bitch in this heat but I love it. I stink of diesel, my fingernails are so black my wife won't come near me and I've really worn in my overalls.
I'm due to fit an EJ25 that I've removed and have these parts for but I have a few questions...
Has anyone done 1.6td to EJ25?
Any jobs I should do now the tank is out ( i gave new straps and sender, and of course it's going to be petrol so will be flushed out. )
Does anyone know the length of positive cable I need to go from the battery ( relocated to behind rhd drivers side rear light) to the starter ( rjes needs to know this for loom build)
Every day the end is in sight...
Thanks.