Hello everyone..
Been doing a few little jobs while waiting for my much needed funds to be released. Once they are available the project out to gather pace.
After reading Neil's reply I prepared the engine ready for new oil seals. Stripping back the engine again was probably a good idea. I didn't feel happy about ignoring the dirty oil seal hidden behind the intermediate sprocket. Here are some flicks of the front and rear of the engine.
A closer peek
The offending seal that bugged me
Ready and waiting for new....
A flick of the rear seal removed
scraps and flange seal faces
I then worked on removing the spigot bearing. I borrowed a tool from work...handy piece of kit too..
Exposed the inner racing and got to work..I set up the puller and screwed on the sliding hammer...out it came...
A new one was then fitted..job done.
I took my flywheel to work and had 4 holes drilled and filled with weld. I had the holes drilled such that the starter ring gear was exposed..enable the weld to bite both surfaces.
The measurements are equal..one question asked was the risk of the flywheel being unballanced because of both heat exposer and filled spot "loads". On the other hand it has been siad because of the flywheels thickness it out not to be affected. If there is any rotational distortion I will more than likely feel it on changing/depressing the clutch..I am going to take a chance on how it is...The chap that did it for me only drilled 4mm into the face. Looks solid and I would like to thank Ian (Silverbullet) for that advice. Take a look at the weld points....
Here is a flick of some goodies I bought from Brickwerks..I ran out of funds at this point...a tidy sum all together.. the new fuel tank was part of the buy, another splendid purchase..
228mm clutch kit..just fitting bolts to get..need to source them plus the size needed. Still havn't worked out the size of bolts needed for the fly wheel..M10's..just the right length and strength...I don't know if you can remember Neil..
New braided clutch pipe and repair kit..plus a few connectors to help me renew mot of the clutch line. I am presuming the swivel end on the braided line is fitted to the clutch slave cylinder. Took about 3 weeks to come from Brickwerks..I received two window stickers and a note apologising for the delay...
Bought new cv boots x4 and 4 chunky Porsche cv joints...The plan here was to prepare the rear drive for a torque engine and towing.
I got to work on the drive shafts and it was an interesting job...never done it before..I am glad that I have renewed them..the ones I took off had served their purpose and looked liked they where ready for replacement.
Out with the old and in with the new....nice..

well chuffed..
Thats it for the time being....I have a few calls to make about things I need as I mentioned on my last post. I am still waiting on Speedy cables..I have asked about the choke cable..yet to hear...I need to catch up with Neil, seems a life time since we had a chat..I shall start my list. Off work now till Sunday....Two more banks of work and I have another 18 days...hopefully I will be fully ready and prepared for a good push on the project...
Thanks for looking..
Tom