Well had an enjoyable time this aft, pitty xmas will get in the way for a few days but there is eating to be done and mass to attend so....
finnished welding the lower side panal in place, the rot went to just shy of the swage thankfully as it saves me having to set too and make the whole bliddy lot.
first part of closure made ,the curved lip at the top of the picky sits up against thge B post and is sealled not welded

and sat in place

and welded

rear half made and drilled ready for spotting through, use a scribe to mark the linne for drilling as it looks better. i have spaced the drills by eye as its not critical here and wont be seen

and sat in place onto the first part, the swaging keeps the two parts the same relative height, again its not critical but its how vw did them when they didnt want twin sliders on the std floorpan

and the rear end

welded

rear

picky is a lot easier than trying to describe stuff
double spots on top of the inner sill

and there you have it

if your doing welding and stuff then buy a pair of these as it saves ages measuring and stops you using your pinky end as a guide down the side of sharp cut metal , which im still guilty of....

mm