well after two 12 hour night shifts which saw me have 7 hours kip in 48 hours, made a start again on the van with help from my dad managed to make up 3 doors for the cupboards laminated up the edges of the work top, fitted my gaslow refillable gas bottle and pipe work, and got the 240v hook up started !!
DJ at Dubdayz Summerfest Now cutting about in an LT35 MWB
Got a load more 240v hook up stuff done today, just the sockets to fit once carpeted, more insulation gone in, bed light, awning light, most of 12v wired up, one drawer done two more not far off done, all in a busy day!
DJ at Dubdayz Summerfest Now cutting about in an LT35 MWB
jamesc76 wrote:where its mounted, gives a direct access to where the light hole inside over the slider
Had just fitted one of these to my Gipsy before it disappeared.
There pretty bright
(about being bright not ya van nicked!!)
Getting there now, rock and roll seat fixed in properly, propex in (needs wired up), rear bed base in, all gas system plumbed in, leisure battery in (finally back on the solar charger again!) To warm to do any more blooming boiling!
DJ at Dubdayz Summerfest Now cutting about in an LT35 MWB
got loads of bits and bobs done today water pump in, propex all wired up and tested, boxed propex in, fitted front of rock and roll bed with holes fro propex and speakers, wanged a load of vanish on all wood work all nice and shiney now! Gonna either get underslung water tank on tomorrow or start on carpeting the walls, all depends how I feel !
DJ at Dubdayz Summerfest Now cutting about in an LT35 MWB