Sills both sides starts Monday 11th

For documenting and technical details of T25 restorations and major repairs
This section is for major restorations only.where to buy a panel or where to buy window rubbers belong in the bodywork seats and glass section.
Also please note,we need pictures of the restorations,without them posts are pretty useless.[\b]
Picture heavy and detailed threads , not for general banter or advertising
Traders welcome to post but not to advertise blatently
Threads will be cleaned of chit chat.

Moderators: User administrators, Moderators

User avatar
itchyfeet
Registered user
Posts: 12427
Joined: 23 Jul 2007, 17:24
80-90 Mem No: 12733
Location: South Hampshire

Re: Sills both sides starts Monday 11th

Post by itchyfeet »

Title reminds me of a Lidl advert :lol:
1988 DG WBX LPG Tin Top
1989 DJ digijet WBX Holdsworth Villa 3 Pop Top
itchylinks

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

do they have lidl in Hemp.shy r :rollin
mm

User avatar
itchyfeet
Registered user
Posts: 12427
Joined: 23 Jul 2007, 17:24
80-90 Mem No: 12733
Location: South Hampshire

Re: Sills both sides starts Monday 11th

Post by itchyfeet »

metalmick8y wrote:do they have lidl in Hemp.shy r :rollin
mm

Yep, don't go in much myself, don't speak the language :lol:
1988 DG WBX LPG Tin Top
1989 DJ digijet WBX Holdsworth Villa 3 Pop Top
itchylinks

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

Well had things to attend to earlier today, but knowing what I know I felt i had better look closer
so off with this area...
Image
the B post is fairly good in itself, you will note the small burn through holes from the gas cutting, well i shall enlarge them a bit more and i need to make a new one to the left of the support piece
Image
so i can weld through them to these areas on the new runner assembly , the items with a cross can only really be got at from the front of the B post ,one of the reasons it had to come off, the area with the straight lines can and is welded on the outside but it should also be puddle welded through ,
Image
the part of the inner sill over the JP is easy enough to do now from above when ive cut a bit more of the rust away.
now the rear wing........................
Image
actually decided it wasnt a good repair
Image
the above is the new arch that was fitted, its been done a strange way ,but.....
dependent on the brief ,this hasnt rotted overnight
Image
not a pretty sight though a common one :lol:
Image
going back to when i said it had been fitted a strange way , well they cut too much off the old arch to enable a clean neat connect and in fact hadnt even welded the arch and wing to each other hence
Image
ive not riven it but the next 6-8" at least is only held by sealant
Image
have cut the new steel to add to the main floor and such its 14 + 16g mostly with some 18 for the less stressed areas.
mm :D

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

Well hacking and scraping and finding even more crap but there is light..............................through the holes :lol: peeling the insulation away
Image
bit like a floating dancefloor really
Image
its just get-at-able the fuel pipem to shift and the two electric bunches, :roll:
front has come away nice and cleaned up the clag and sealant so no issues here really
Image
I may make the outriger up first along with the front portion which will be cut open tomoz after water fill stuff and exp tank are out, then de-underseal/sealant it and lastly add the inner sill on top , seems like a nicer way of doing it, we shall see
Image
again this has scraped off nicely so will pose nom issues
Image
and this lip is easy enough , i have the steel cut
Image
but this is an issue as theres not much left to work on or reference to
Image
this is i think 14g or was..... its one of the most important areas of support to the jp and rear arm,
Image
so wwhat and how to do it 8)
mm

User avatar
Ian Hulley
Registered user
Posts: 12659
Joined: 11 Oct 2005, 08:08
80-90 Mem No: 1323
Location: Wirksworth, Derbyshire ... or at t'mill

Re: Sills both sides starts Monday 11th

Post by Ian Hulley »

Is that my loose change I spy in there ? :pimp

Ian
The Hulley's Bus
1989 2.1DJ Trampspotter
LPG courtesy of Steve @ Gasure

User avatar
nicq
Registered user
Posts: 1185
Joined: 24 Sep 2011, 19:03
80-90 Mem No: 10290
Location: Cranleigh Surrey

Re: Sills both sides starts Monday 11th

Post by nicq »

Ian Hulley wrote:Is that my loose change I spy in there ? :pimp

Ian
I don't think you'll have any after this job.
Good thread to follow keep it up MM..
2.1 Twin slider

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

nah, it was easier to note an area than use peebucket to "annotate" the area , but i will weld the coin in there....
so just cut a bit more out
Image
i will detail why etc later
Image
test fittings
Image
..
Image
...
Image
...
this will give me something to work from
Image
lunch over
mm :D

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

Well..
adding, which is always a turning point, lip is from 2mm so matches the oe
Image
first weld proper with the new torch, very happy with it (the torch)its taken a while to find the right one
Image
other bit done
Image
underside
Image
...
it will just get a quick flick with the disc and a run of sealant
Image
next the floor extension is made
Image
then drilled and chamfered
Image
ready for a weld
Image
...
Image
this will get a light run with the disc
Image
...
Image
welded
Image
...
Image
this is now done and after a very light sand will be fine enough
Image
from underside, again just a light clean off and seal
Image
...
a quick trial fit again
Image
...
Image
this is the only bit of the welding here thats seen and is an easy job to neaten and a smear of seam sealer
Image
voila
Image
A happy afternoon
mm :D

User avatar
nicq
Registered user
Posts: 1185
Joined: 24 Sep 2011, 19:03
80-90 Mem No: 10290
Location: Cranleigh Surrey

Re: Sills both sides starts Monday 11th

Post by nicq »

Beautifully done.
:ok
2.1 Twin slider

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

Well its a sunday
so set about sorting the front jp
Image
first cut
Image
ive gone inboard of the jp bracket and back to good steel, also made the inner sill that foes in there ,all 2mm
picks will have to wait.
had a quick look up here after removing the exp tank
Image
will remake the tank mount differently ,not sure how to proceed here as there is a lot of rot along the top of the innerwing, the arch bottom has gone and the front near the step is unhappy with itself................
then i ran out of gas :roll:
mm

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

well after 30 + years I snap my strongarm trying to undo the front wheel nuts

Image
next a snap on windy gun ....nope, gonna recharge then try again then a 6' breaker bar, :roll:
mm

User avatar
Ian Hulley
Registered user
Posts: 12659
Joined: 11 Oct 2005, 08:08
80-90 Mem No: 1323
Location: Wirksworth, Derbyshire ... or at t'mill

Re: Sills both sides starts Monday 11th

Post by Ian Hulley »

metalmick8y wrote:well after 30 + years I snap my strongarm trying to undo the front wheel nuts

:oops: Sorry about that :|

Ian
The Hulley's Bus
1989 2.1DJ Trampspotter
LPG courtesy of Steve @ Gasure

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

Well,, decided to do some cutting, its always nice to get the bulk of the crap out the way
Image
pretty much the same as the other side
ditto
Image
but at least the middle bit is worse :lol:
Image
floor has been nibbled away a bit more here
Image
this bit at the rear is mainly secured to the C post with sealant (vw)
Image
now to remove some rubbish
Image
this makes life easier as its a simple welding job, always take time and think before cutting as in how am i going to remake this ,all too easy to take too much off the wrong area and make work for yourself
Image
pride and joy
Image
os B post not as bad as some
Image
but wing btm is nasty , so where do you stop ?
Image
gradual cleaning up
Image
..
Image
we have a gap :lol:
Image
..
Image
folded a nice new lip for the bottom
Image
...
Image
flat pack parts
Image
and lots of cleaning underneath
Image
...
Image
mm :D

Plasticman
Trader
Posts: 8047
Joined: 12 Oct 2005, 20:55
80-90 Mem No: 1948
Location: lincolnshire

Re: Sills both sides starts Monday 11th

Post by Plasticman »

6 foot cheater bar and still only got one front wheel bolt off !!!! torque multiplier next..
I'd suggest everyone loosens and redoes their wheel nuts............
mm :roll:

Post Reply